-
Main Projects
UBS for corn - Matão - 4.5 tons/h and for Ituiutaba 6.0 tons/h.
-
Main Projects
Terminal interconnection Paranaguá transport 1.500 tons/hour.
-
Main Projects
New connection between Paranaguá corridor and their port terminal - 1.500 tons/h and storage bins study for 45.000 tons.
Draft project and specifications for the construction of a grain of 80.000 tons.
-
Main Projects
Interconnection with the terminal corridor Paranagua - flow 1.500 tons/hour.
-
Main Projects
Draft project and feasibility study for the construction of a port terminal for dry bulk.
-
Main Projects
Feasibility study for the construction of a maritime terminal for sugar in bulk.
-
Main Projects
Interconnection with the terminal corridor Paranagua - flow 3.000 tons/hour.
-
Main Projects
Interconnection with the terminal corridor Paranagua - flow 1.500 tons/hour.
-
Main Projects
Proposed implementation for bidding TEVECON/APPA.
-
Main Projects
Technical evaluation of the mobile carrier and its structure/gallery Paranaguá terminal.