• Main Projects

    UBS for corn - Matão - 4.5 tons/h and for Ituiutaba 6.0 tons/h.

  • Main Projects

    Terminal interconnection Paranaguá transport 1.500 tons/hour.

  • Main Projects

    New connection between Paranaguá corridor and their port terminal - 1.500 tons/h and storage bins study for 45.000 tons.

    Draft project and specifications for the construction of a grain of 80.000 tons.

  • Main Projects

    Interconnection with the terminal corridor Paranagua - flow 1.500 tons/hour.

  • Main Projects

    Draft project and feasibility study for the construction of a port terminal for dry bulk.

  • Main Projects

    Feasibility study for the construction of a maritime terminal for sugar in bulk.

  • Main Projects

    Interconnection with the terminal corridor Paranagua - flow 3.000 tons/hour.

  • Main Projects

    Interconnection with the terminal corridor Paranagua - flow 1.500 tons/hour.

  • Main Projects

    Proposed implementation for bidding TEVECON/APPA.

  • Main Projects

    Technical evaluation of the mobile carrier and its structure/gallery Paranaguá terminal.